Warehouse and canteen building
A 22,000 sq ft warehouse executed in all aspects, and a 3,200 sq ft canteen building.
A PEB warehouse with dock-level loading bays and a covered apron, and a separate canteen building, both in CCL’s SEZ development area. Misc civil works order of ₹55 lakh (August 2019).
Have a site, a scope and a date?
Send us the brief and a director will call you back within a working day.