WMM & BT roads, SEZ and DTA areas
2,000 m of WMM and BT roads across the SEZ and DTA areas, with 2 km of RCC drains and harvesting sumps.
Bituminous road works awarded in May 2019 — ₹1.4 crore for the SEZ area and ₹70 lakh for the DTA area — from red-earth formation to finished BT, with RCC drains and rainwater harvesting sumps along the alignment.
Have a site, a scope and a date?
Send us the brief and a director will call you back within a working day.