Road Construction
Base preparation, WMM laying and bituminous surfacing for plant roads, SEZ internal roads and approaches, with kerbs and RCC drains alongside.
What this covers
- Sub-base and WMM layers
- Bituminous (BT) surfacing
- Kerbs, drains and rainwater sumps
Related work
Road Construction on site
Projects we have delivered or have under way in these sectors.
CCL Products, EOU-II
WMM & BT roads, EOU-II Kuvvakolli
1,000 m of road base preparation and WMM laid; 1,000 m of BT road in execution.
CCL Products (India) Ltd
WMM & BT roads, SEZ and DTA areas
2,000 m of WMM and BT roads across the SEZ and DTA areas, with 2 km of RCC drains and harvesting sumps.
Have a site, a scope and a date?
Send us the brief and a director will call you back within a working day.