Modernization of Vamsadhara Project
Five open head channels on the left side, the left main canal distributory network, and the Bhyri open head channel taking off downstream of Gotta Barrage.
Modernisation of the Vamsadhara left-side system: five open head channels with their distributory network serving the ayacut, and the Bhyri open head channel on the right side, downstream of the Gotta Barrage.
Work includes survey and setting out, earthwork in cutting and embankment, and lining of the channels.
Have a site, a scope and a date?
Send us the brief and a director will call you back within a working day.